Friday, March 14, 2008

Pillians Point Tunnel - Fulton Hogan



Pictured the GMK5130 - 130 Tonne crane works with the team from Fulton Hogan as they place the finishing touches on the Pillians Point Tunnel Outlet.
Posted by Picasa

Labels: , ,