Friday, October 09, 2009

Harbour Links Last Beam



Well its been a busy week with Fletcher Construction placing the last beam on The NZ Transport Agency Harbour Link Project. Peter McLeod our structural engineer has had his hands full working closely with engineer Gareth Hole from Fletchers planning a very technically complex lift. Maximus (GMK5170) operated by Brian Short and Lofty (GMK5130) operated by Justin Martin with very short outriggers to place a 70 Tonne Steel Beam with the help of Roy Ogle dogging it gently into place. You can read the full story on SunLive or at the Bay of Plenty Times websites. "It will be quite an engineering feat," Harbour Link project manager Kevin Reid said.
Posted by Picasa

Labels: , , , , ,

Wednesday, September 20, 2006

Luff Down

I thought I better post something to give people an idea of the sort of thing Peter gets up to. I wouldn't be too keen to see what this looks like on a rough day at sea. Posted by Picasa

Labels: ,

Friday, September 15, 2006

A 500 Tonne Hook?

Here we have Peter McLeod standing infront of one of the hooks on Saipem 7000. They don't get much bigger than this (7000 Tonne Capacity). The spreader bar in the background puts our little ones here in the yard to shame. Posted by Picasa

Labels: ,

Saipem 7000


Latest picture from Peter McLeod. Peter is currently working on Saipem 7000 as a Structual Installation Engineer. Awesome pictures Peter - Keep them coming! Posted by Picasa